Safety harnesses (with double lanyards), hard hats, hi-vis vests, and steel-toed boots. 5. Step-by-Step Dismantling Procedure Phase 1: Preparation
The assist crane supports the counter-jib while pins are removed. The tower head (apex) is disconnected and lowered. Phase 5: Mast Section Removal
The slewing ring and cab are typically removed as one unit before the final mast sections. Phase 6: Base & Foundation The fixing angles or foundation anchors are released. The remaining base section is removed. tower crane dismantling method statement
Ensures all components are balanced and secured before disconnecting.
The crane is rotated to the pre-agreed "parked" position to allow the assist crane access. Safety harnesses (with double lanyards), hard hats, hi-vis
Valid local authority permits for road closures or sidewalk diversions.
The assist crane takes the tension of the first counter-weight. Riggers remove the retaining pins. The tower head (apex) is disconnected and lowered
Any ballast weights at the base are loaded onto transport trucks. 6. Safety & Environmental Controls
All team members must use a dedicated radio frequency.