Wella Climazon Millenium Manual Install [patched] -

Wella Climazon Millenium Manual Install [patched] -

Use the brake screws on the arm to adjust the swivel resistance and the internal tension screw to balance the vertical movement based on the head's weight. 4. Technical Maintenance and Resources

Align the mounting bracket and mark the drill holes. Insert heavy-duty wall anchors and secure the bracket with the provided high-tensile screws. Phase B: Attaching the Arm and Head

Use the integrated cable holder (standard on ST5 models) to secure the power cord, preventing tripping hazards during salon use. 3. Wall-Mounted Installation: Step-by-Step wella climazon millenium manual install

Ensure the area allows for the movement of the side heating arms, which are adjustable and foldable. 2. Pedestal (Mobile) Installation: Step-by-Step The mobile version typically utilizes the ST5 Pedestal . Phase A: Assembling the Base

Wall-mounted versions must be installed by a qualified specialist (electrician or technical expert) to ensure secure fixing and correct electrical wiring. Use the brake screws on the arm to

Slide the Climazon head onto the pin at the end of the spring arm. Ensure the safety screw or locking pin is fully engaged to prevent accidental detachment.

Wall installation requires the (WA04) wall arm or similar approved support. Phase A: Fixing the Wall Bracket Insert heavy-duty wall anchors and secure the bracket

Comprehensive Installation Guide for the Wella Climazon Millenium

The (often referred to in technical documentation alongside the Climazon²) is a cornerstone of professional salon equipment, offering precision infrared heating for coloring, perming, and drying treatments. Proper installation is critical to ensure both the safety of your clients and the longevity of the device.